Bring CodeQL back to pull requests as jobs of PR CI itself (needed by
ci-ok, no polling), narrowed to first-party code, while push to main,
the weekly run, the dry run and the release keep the full scan.
- codeql.yml: one leg per language (c-cpp, javascript-typescript,
python, actions), scope in .github/codeql/codeql-config.yml. The full
scan traces the whole build, vendored C included. The PR scan
(light: true) analyses each selected language's whole first-party
scope; c-cpp compiles the third-party objects before tracing
(scripts/build.sh --vendored-only) and then traces the first-party
build plus the vendored files the PR changes (--reuse-vendored
--retrace-from, make -W). Diff-informed analysis (codeql-action
v4.38.1, forced on for PR calls) only restricts reported alerts.
The alert check moves into each leg and reads the analysed ref.
Push and PR runs cancel superseded runs per language; dispatched
runs never cancel. Compiler cache off so every compile is traced.
- pr.yml: a codeql job runs the legs of the selected codeql-* lanes;
ci-ok needs it.
- select-lanes.sh: codeql-cpp/-js/-py/-actions lanes, selected by a
change in their scope (any C/C++ incl. vendored; JS/TS, Python and
workflows inside the config's paths minus paths-ignore) and by every
full run (undeterminable diff, workflows, build, CodeQL machinery).
--codeql-scope LANGUAGE prints a list's in-scope paths.
- codeql-retrace-vendored.sh: the vendored C files a PR changes (empty,
never narrowing, when the diff cannot be determined).
- Makefile.cbm: cbm-third-party builds the vendored prod objects only.
- tests: the gate contract pins the new layout; the selector contract
pins that a C change always selects the C scan, an undeterminable
diff selects every language, and a vendored-only change retraces
exactly the changed vendored files. Selector fixtures, ci-ok's job
map, the replay's codeql-action failures (lane codeql-cpp) and the
interface probes follow.
Signed-off-by: Martin Vogel <martin.vogel.tech@gmail.com>
CodeQL ran on every pull_request push, and PR CI's security / codeql-gate
job polled up to 150 min for that run before ci-ok could pass. With ~30 PRs
pushed at once, the gate jobs held runners while the CodeQL runs they waited
for queued behind them, and PR CI starved for hours.
- codeql.yml: triggers are push to main, a weekly schedule, workflow_call
and workflow_dispatch; pull_request is gone. The open-alert check moves
here, unchanged and still fail-closed, as the `alerts` job (needs
analyze), so every main push and every weekly run fails while any
code-scanning alert is open. Push runs keep cancel-in-progress; called and
scheduled runs get a group of their own. The analysis key is pinned to the
push configuration so dry-run/release uploads do not open configurations
of their own on main.
- _security.yml: codeql-gate removed; callers grant contents: read only.
- dry-run.yml, release.yml: a `codeql` job calls codeql.yml on the
dispatched commit; release verify needs it and requires success.
- select-lanes.sh, require-all-green.sh: the codeql-gate lane is gone from
the selector universe and from ci-ok's job map; no other lane changes.
- tests: the fail-closed contract follows the check to codeql.yml and now
also pins the triggers, the derived callers' grants and release verify;
lane fixtures drop codeql-gate.
- SECURITY.md, MAINTAINERS.md: say where CodeQL runs now.
Signed-off-by: Martin Vogel <martin.vogel.tech@gmail.com>
Under lane selection a PR runs a subset of its jobs, and "skipped" stops
meaning "not needed": a selected lane that was skipped, cancelled or never
created is a silent gate loss that the needs-level ci-ok waves through.
require-all-green.sh keeps the needs-level check and, when given the
selector's LANES and the run's JOBS (Actions API job list), requires every
selected lane to have at least one job and all of them to have succeeded.
Unselected lanes may be skipped or absent but may not fail; memwaste stays
report-only. A selection it cannot trust (not a JSON list, unknown lanes, or
neither lint nor contracts) is red. Matrix jobs are mapped by the lane value
in their name, single jobs by their job id.
verify-shard-union.sh takes an optional --lanes: no manifests at all is
green only when the selection holds no test leg; without --lanes (dry run,
release) or with "all" it fails exactly as before.
tests/test_lane_gate_contract.sh drives both with synthetic inputs
(selected-skipped/cancelled/missing -> red, unselected-skipped -> green,
no legs -> green only for an empty leg selection); Step 0z3.
Signed-off-by: Martin Vogel <martin.vogel.tech@gmail.com>
git-apply of the staged unification recorded the new canonical entries
as 100644; workflows execute them directly (run: scripts/ci/...), so a
fresh CI checkout would fail at ci-ok/shard-union/soak/package steps
with permission denied — the same class the parity worktree's own
preflight just tripped over locally.
Signed-off-by: Martin Vogel <martin.vogel.tech@gmail.com>
The staged venue-unification bundle: _smoke.yml onto the shared
wrappers with an extracted-artifact input (CBM_SMOKE_ARTIFACT_DIR),
soak-legs.sh as the one canonical soak entry (quick + query-leak legs
across all venues), protected per-user TEMP roots shared across
venues, clean-disk preflights before every VM/Docker run, win.sh and
run.sh routed through the canonical scripts, soak.yml retired, and
the venue-parity contract (whitelist walker: workflows may provision
or call canonical entries, nothing else).
Signed-off-by: Martin Vogel <martin.vogel.tech@gmail.com>